Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "NG23"

15 unique locations (117 components)

Land South of Staythorpe Road, Staythorpe, NG23 5RG (2 components)

New build battery storage

Active • 2028-29 (T-4)
37.69 MW
(Estimated)
LAND SOUTH OF TUXFORD ROAD, SKEGBY, NOTTINGHAMSHIRE, NG23 6TH. (1 component)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4)
8.88 MW
(Estimated)
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (2 components)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.26 MW
(Estimated)
NG23 (45 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
DSR EV Charging Part of Octopus Energy Group Limited LEVELISE LIMITED NG23
Active • 2027-28 (T-4), 2025-26 (T-4) ...
124.81 MW
(Estimated)
NG23 7ST (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
(Estimated)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Storage (Duration 2h) Part of SSE plc SSE UTILITY SOLUTIONS LIMITED Not Prequalified NG23
Active • 2027-28 (T-4)
36.01 MW
(Estimated)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (54 components)
• Staythorpe 1 - CCGT
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT
• ... and 2 more unique descriptions
Combined Cycle Gas Turbine (CCGT) Part of RWE Generation UK Holdings Limited RWE GENERATION UK PLC NG23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
(Estimated)
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (2 components)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.26 MW
(Estimated)
Loading map...
Showing 8 locations