Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "NG22"

17 unique locations (65 components)

Sort by: Relevance A-Z Components MW Date
Bilsthorpe Energy Park - Former Colliery - Bilsthorpe - Newark - Notts - NG22 8ST (2 components)

2x 1.56MW Containerised Generating sets. Bilsthorpe Energy Park - Former Colliery - Bilsthorpe - Newark - Notts - NG22 8ST. Auxiliary load subtracted prior to the metering point.

Inactive • 2017-18 (T-1)
No capacity data
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (3 components)

1x 1.55MW Containerised Generating sets.

Inactive • 2016-17 (TR)
1.07 MW
No capacity data
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (3 components)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
Bilsthorpe Colliery Site,Bilsthorpe, Newark, Notts, NG22 8ST (2 components)

MWM TCG 2020 x 2 1 x CAT 3520

Inactive • 2017-18 (T-1)
No capacity data
Boughton, Harrow Lane, Boughton, NG22 9ZB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

UK Energy Reserve Limited Not Prequalified NG22
Inactive • 2020-21 (T-4)
No capacity data
Edwinstowe, Ollerton Road, NG22 9DX (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

UK Energy Reserve Limited Not Prequalified NG22
Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
FARM WESTON ROAD EGMANTON NEWARK NOTTINGHAMSHIRE NG22 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
(Estimated)
Land at Finns Barn, Wellow Road, Eakring, Newark, NG22 0FW (1 component)

A standalone 0.949MW BESS connected directly to the DNO network.

Active • 2025-26 (T-1)
0.26 MW
No capacity data
Lincoln Road Newark Nottinghamshire NG22 (2 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0080 MW
NG22 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
Yearsley - Belle Eau Park, Belle Eau Park, Bilsthorpe, Newark NG22 8TX, UK (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
No capacity data
Loading map...
Showing 13 locations