Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP"

1 unique locations (18 components)

MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (18 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.63 MW (Est from CMU) (part of 21.63 MW aggregated CMU)
(Estimated)
Coal Aston, Dronfield, S18 3AA (3 components)
• A 45MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
37.63 MW
(Estimated)
Ipswich Road, Cardiff, CF23 9AQ (8 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.79 MW (Est from CMU)
(Estimated)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (16 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.53 MW (Est from CMU)
(Estimated)
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
3.18 MW (Est from CMU)
(Estimated)
Pepsico, Unit W/Siskin Parkway West, Coventry CV3 4PW (1 component)

2.52MW Battery Storage located at PepsiCo Coventry

Active • 2024-25 (T-4)
2.31 MW (Est from CMU) (part of 2.31 MW aggregated CMU)
(Estimated)
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
15.04 MW
(Estimated)
Victory Road, Derby, Derbyshire, DE24 9HX (7 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Active • 2028-29 (T-4), 2026-27 (T-4) ...
164.48 MW (Est from CMU)
(Estimated)
Walker's 146 Newark Rd, Lincoln LN5 8QF (1 component)

0.4MW Battery Storage located at PepsiCo Lincoln factory

Active • 2024-25 (T-4)
2.31 MW (Est from CMU) (part of 2.31 MW aggregated CMU)
(Estimated)
Loading map...
Showing 9 locations