Search Results for "MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP"

1 unique locations (17 components)

MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.32 MW
(Estimated)
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (5 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines Part of Whitetower Holdings UK Limited WHITETOWER ENERGY LIMITED TS2
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
16.23 MW (Est from CMU)
(Estimated)
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) Part of Ylem Group Limited ROOT-POWER (NORTH) LIMITED Not Prequalified WF7
Active • 2028-29 (T-4)
10.47 MW
(Estimated)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Active • 2024-25 (T-4), 2022-23 (T-4) ...
4.95 MW
(Estimated)
Ipswich Road, Cardiff, CF23 9AQ (14 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
16.54 MW
(Estimated)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (7 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Battery Storage (Duration 1h) Part of RNA-Energy Ltd RNA-Energy Ltd Not Prequalified AL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
10.57 MW
(Estimated)
Land Off Turnpike Road, Blunsdon, Swindon, Wiltshire. SN26 7EA (1 component)

New build gas reciprocating multi-engine generating plant

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
1.60 MW
(Estimated)
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
3.18 MW
(Estimated)