Search Results for "MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP"

1 unique locations (17 components)

MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.32 MW
(Estimated)
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (7 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output (3)

OCGT and Reciprocating Engines Part of Whitetower Holdings UK Limited WHITETOWER ENERGY LIMITED A3
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(De-rated)
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (11 components)

CHP Engine 3.360MW

Active • 2026-27 (T-4), 2025-26 (T-4) ...
40.50 MW
(Estimated)
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
526.50 MW
(Estimated)
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
No capacity data
(De-rated)
Ipswich Road, Cardiff, CF23 9AQ (14 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
16.54 MW
(Estimated)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (7 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Battery Storage (Duration 1h) Part of RNA-Energy Ltd RNA-Energy Ltd Not Prequalified AL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
10.57 MW
(Estimated)
Newbury Works, Coleford, Radstock, BA3 5RX (1 component)

New build gas reciprocating multi-engine generating plant

Inactive • 2022-23 (T-4)
No capacity data
(De-rated)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.16 MW
(Estimated)
Pepsico, Unit W/Siskin Parkway West, Coventry CV3 4PW (1 component)

2.52MW Battery Storage located at PepsiCo Coventry

DSR Part of Zenobe Energy Limited ZENOBE K-S Limited DNU CV3
Active • 2024-25 (T-4)
2.31 MW
(Estimated)
Tillingdown Lane, Caterham, CR3 7JA (4 components)
• A 12MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
7.52 MW
(Estimated)
Walker's 146 Newark Rd, Lincoln LN5 8QF (1 component)

0.4MW Battery Storage located at PepsiCo Lincoln factory

DSR Part of Zenobe Energy Limited ZENOBE K-S Limited DNU LN5
Active • 2024-25 (T-4)
2.31 MW
(Estimated)