Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP"

2 unique locations (27 components)

MMDSS - Site 3, Flathouse Quay, Portsmouth PO2 7SP (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
21.63 MW (Est from CMU) (part of 21.63 MW aggregated CMU)
(Estimated)
Church Manorway, Erith DA8 1DL (60 components)
• N/A
• gas-fired CHP unit
Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.35 MW (Est from CMU) (part of 50.35 MW aggregated CMU)
(Estimated)
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (11 components)

10MW of Battery Energy Storage Systems to be built.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.12 MW (Est from CMU) (part of 21.12 MW aggregated CMU)
(Estimated)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (13 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
45.92 MW (Est from CMU) (part of 45.92 MW aggregated CMU)
(Estimated)
MMDSS - Site 1, Flathouse Quay, Portsmouth PO2 7SP (14 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2026-27 (T-4) ...
14.45 MW (Est from CMU) (part of 14.45 MW aggregated CMU)
(Estimated)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (3 components)
• ElecLink has a transmission capacity of 1000MW corresponding to its grid connection agreements and link the 400kV AC grids of France and Great Britain. ElecLink employs voltage direct current converter stations using voltage source converter technology at each side of the Channel Tunnel. 400kV AC underground cables connect the converter stations to the TSO's high voltage substations: Sellindge (NGET, UK) and Les Mandarins (RTE, France). The converter station on the Eurotunnel site at Folkestone is connected by one 400kV AC cable circuit to the National Grid substation at Sellindge. The route length is approximately 14km. The converter station on the Eurotunnel site at Coquelles is connected by one 400kV AC cable circuit to the RTE substation at Les Madarins. The route length is approximately 3.5km. An approximately 52km long HVDC cable circuit connects the two converter stations via the Channel Tunnel between Folkestone and Coquelles. This involves two single-core HVDC cables operating at +-320kV DC. Please note that in the section below we provided an address for the CMU which relates to the UK converter station site. Of course, given the CMU is an interconnector there are a variety of sites which are owned/managed by ElecLink and relate to the CMU, as additional information we have provided details of those sites below. Please note also that we have provided the grid reference points which most closely correspond to the sites, however the postcode for the address will capture a wider area. Sellindge substation Church Lane Aldington Ashford TN25 6SS Grid reference: TR082383 Converter station at Coquelles, France Eurotunnel Entrance Centre De Secours, 3573 Chemin Rouge Cambre, 62231 Coquelles, France Grid reference: TR657202
• New build two-hour duration battery storage
Active • 2027-28 (T-4), 2026-27 (T-4)
4.16 MW (Est from CMU)
(Estimated)
Plot 3, Barrow Man Road, Birchington CT7 0AX (18 components)
• Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
17.46 MW (Est from CMU) (part of 17.46 MW aggregated CMU)
(Estimated)
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW (Est from CMU) (part of 2886.91 MW aggregated CMU)
(Estimated)
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (4 components)
• A 50MW Distribution Connected Battery Energy Storage System
• A Distribution Connected Battery Energy Storage System
Active • 2028-29 (T-4)
62.68 MW
(Estimated)
Loading map...
Showing 9 locations