Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU"

1 unique locations (9 components)

Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (9 components)

Battery energy storage unit

Storage (Duration 2h) Part of MERCIA POWER LIMITED FRP MERCIA HOLDCO LIMITED NG4
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.48 MW
(Estimated)
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) Part of Fpc Income & Growth Plc FPC ELECTRIC LAND LIMITED DE14
Active • 2028-29 (T-4)
5.24 MW
(Estimated)
Connah's Quay 400 kV Substation, Kelsterton Lane, Connah?s Quay, Flintshire, North Wales, CH5 4BP (15 components)

The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
270.00 MW
(Estimated)
EDF Energy, Dungeness B power station, Romney Marsh, Kent, TN29 9PX (32 components)
• Dungeness B Power Station CMU 21: [DN2117] T_DNGB21 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 21: [DN2118] T_DNGB21 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 21: [DN2119] T_DNGB21 + (50% x T_DNGB-D)
• ... and 2 more unique descriptions
Nuclear Part of EDF Energy Holdings Limited EDF ENERGY NUCLEAR GENERATION LIMITED TN29
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1489.08 MW
(Estimated)
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (105 components)
• West Burton A Power Station CMU 1 WA1-18 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-19 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-20 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2472.54 MW
(Estimated)
IFA2 National Grid Land at Daedalus Airfield Lee-on-the-Solent PO13 9YA (8 components)

1,100MW electricity interconnector between GB and French transmission systems. IFA2 will use a High Voltage Direct Current (HVDC) cable for the connection between Great Britain and France. The electricity must …

IFA2 (France) Part of National Grid Interconnector Holdings Limited NATIONAL GRID IFA 2 LIMITED PO13
Active • 2024-25 (T-4), 2023-24 (T-4) ...
928.40 MW
(Estimated)
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ (2 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

Storage (Duration 1.5h) Part of Fpc Income & Growth Plc FPC ELECTRIC LAND LIMITED Not Prequalified DE14
Active • 2027-28 (T-4), 2026-27 (T-4)
4.44 MW
(Estimated)
NSL UK Converter Station, East Sleekburn, Bedlington NE22 7FG. (1 component)

NSL is a subsea high-voltage direct current electricity cable between Norway and the United Kingdom which connects the Transmission Systems of Norway and Great Britain. The cable runs from Kvilldal …

NSL (Norway) Part of National Grid Interconnector Holdings Limited NATIONAL GRID NORTH SEA LINK LIMITED NE22
Active • 2028-29 (T-4)
1050.00 MW
(Estimated)
Saltend Power Station Saltend Hull HU12 8GA (39 components)
• Unit 1 at Saltend Power Station
• Unit 1 at Saltend Power Station.
• Unit 2 at Saltend Power Station
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3486.78 MW
(Estimated)
Sloy Power Station, Arrochar, G83 7DP (32 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
408.32 MW
(Estimated)
Sloy Power Station, Inveruglas, By Arrochar, Argyll, G83 7DP (18 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Hydro Part of SSE plc SSE GENERATION LIMITED G83
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.09 MW
(De-rated)
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (54 components)
• Staythorpe 1 - CCGT
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT
• ... and 2 more unique descriptions
Combined Cycle Gas Turbine (CCGT) Part of RWE Generation UK Holdings Limited RWE GENERATION UK PLC NG23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6050.24 MW
(Estimated)
Loading map...
Showing 12 locations