Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Land Forming Part Of Totnes Road Ipplepen Newton Abbot, TQ12 5TN"

1 unique locations (1 components)

Land Forming Part Of Totnes Road Ipplepen Newton Abbot, TQ12 5TN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
Ardrossan Windfarm, Haupland and Busbie Muir, Little Busbie Farm, Ardrossan, Ayrshire, KA22 7NU (2 components)

This CMU is Ardrossan wind farm, an onshore wind farm situated in Scotland

Active • 2028-29 (T-4), 2027-28 (T-4)
4.09 MW
(Estimated)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.26 MW (Est from CMU) (part of 16.26 MW aggregated CMU)
(Estimated)
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (10 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• Gas reciprocating engines.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
34.08 MW (Est from CMU) (part of 34.08 MW aggregated CMU)
(Estimated)
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (13 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.06 MW (Est from CMU) (part of 28.06 MW aggregated CMU)
(Estimated)
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (12 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Existing Energy from Waste Plant
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.27 MW (Est from CMU) (part of 37.27 MW aggregated CMU)
(Estimated)
Yearsley - Heywood, Hareshill Road, Heywood OL10 2TP, UK (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.99 MW (Est from CMU) (part of 28.99 MW aggregated CMU)
(Estimated)
Loading map...
Showing 7 locations