Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Land Forming Part Of Totnes Road Ipplepen Newton Abbot, TQ12 5TN"

1 unique locations (1 components)

Land Forming Part Of Totnes Road Ipplepen Newton Abbot, TQ12 5TN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Storage (Duration 2.5h) Part of Amp Clean Energy Limited BATTERY BOX LIMITED Not Prequalified TQ12
Active • 2028-29 (T-4)
0.05 MW
(Estimated)
Gas Works Road, Lowestoft, NR32 1UZ (7 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.80 MW
(Estimated)
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (2 components)

A new build gas fuelled generation plant with ancilliary equipment.

Reciprocating engines Part of Fpc Income & Growth Plc ELECTRIC LAND & POWER LIMITED Not Prequalified SA5
Active • 2028-29 (T-4)
18.70 MW
(Estimated)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (5 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) Part of Fpc Income & Growth Plc FPC ELECTRIC LAND LIMITED Rejected ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.36 MW
(Estimated)
Land off Edinburgh Road, Cockenzie, EH32 9SD (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG (3 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 2h) Part of Fpc Income & Growth Plc FPC ELECTRIC LAND LIMITED B30
Active • 2027-28 (T-4), 2026-27 (T-4)
4.73 MW
(Estimated)
lLand off Lincomb Lane, Lincomb, Stourport On Severn, DY13 9RB (2 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Storage (Duration 2h) Part of Fpc Income & Growth Plc FPC ELECTRIC LAND LIMITED Rejected DY13
Active • 2028-29 (T-4)
20.73 MW
(Estimated)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (14 components)
• 7 MW of Battery Storage located at Grantham. (3)
• Battery Storage located at Grantham. (2)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.77 MW
(Estimated)
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active • 2028-29 (T-4)
19.79 MW
(Estimated)
Private Road No.5, Colwick, Nottingham, NG4 2JU *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (4 components)
• New reciprocating genset in acoustic enclosure
• New reciprocating engine in acoustic enclosure.
Inactive • 2022-23 (T-4), 2018-19 (T-1)
No capacity data
(De-rated)
Loading map...
Showing 11 locations