Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "LS25 6LH"

5 unique locations (9 components)

Sort by: Relevance A-Z Components MW Date
Gascoigne Wood Mine Lennerton Lane Sherburn in Elmet LS25 6LH (3 components)

Bio-liquid fuelled distribution connected generation station

Inactive • 2020-21 (T-4), 2017-18 (T-1)
0.00 MW
(Estimated)
Gascoigne wood Mine Lennerton Lane Sherburn in Elmet Selby LS25 6LH (1 component)

Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW

Inactive • 2020-21 (T-4)
0.00 MW
(Estimated)
Gascoigne Wood Mine Lennerton lane Sherburn in Elmet Selby LS25 6LH (1 component)

Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW

Inactive • 2020-21 (T-4)
0.00 MW
(Estimated)
Gascoigne Wood Mine Lennerton Lane Sherburn in Elmet Selby LS25 6LH (2 components)
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 110 KW
• Recprocating diesel engine as illustrated with the attached metered line diagram and CMU outline plan. Parascitic load will be 75KW
Inactive • 2020-21 (T-4)
0.00 MW
(Estimated)
Plot 15, Sherburn Rail Freight Terminal New Lennerton Lane Leeds LS25 6LH (2 components)

CMU is a 20MW facility, metered at the distribution network boundary using a COP2 meter, with no auxilliary load on site

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Loading map...
Showing 5 locations