Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "LAND TO THE NORTH-EAST SIDE OF BRYN ROAD ASHTON-IN-MAKERFIELD WN4 8BX"

2 unique locations (10 components)

LAND TO THE NORTH-EAST SIDE OF BRYN ROAD ASHTON-IN-MAKERFIELD WN4 8BX (6 components)
• A gas fuelled generating station.
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
No capacity data
(Estimated)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (7 components)
• Existing OCGT
• New build power station comprised of multiple reciprocating engines.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
83.72 MW (Est from CMU) (part of 83.72 MW aggregated CMU)
(Estimated)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (5 components)

Battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
Clarke Avenue Porte Marsh Industrial Estate Calne SN11 9BS (7 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-1) ...
40.94 MW (Est from CMU) (part of 40.94 MW aggregated CMU)
(Estimated)
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (46 components)
• 2MW - 2.3MWh Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1528.52 MW (Est from CMU) (part of 1528.52 MW aggregated CMU)
(Estimated)
Land south of Greengill Head Farm, off Maidenhill Road, Penrith, Cumbria CA11 8SH (3 components)

Electro-Chemical Battery Energy Storage System (BESS)

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
LAND TO THE NORTH-EAST SIDE OF BRYN ROAD ASHTON-IN-MAKERFIELD WN4 8BX (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
No capacity data
(Estimated)
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW (Est from CMU) (part of 827.61 MW aggregated CMU)
(Estimated)
Lostock Works Griffiths Road Lostock Gralam Northwich CW9 7FA (1 component)

Twin boiler, single steam turbine energy from waste plant exporting at 132kV

Active • 2024-25 (T-4)
59.27 MW
(Estimated)
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (22 components)
• DSR component providing load turn down at a retail store
• Paper products manufacturing site carrying out DSR by load turn-down
• Unit 3 at Saltend Power Station.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.01 MW (Est from CMU) (part of 20.01 MW aggregated CMU)
(Estimated)
Loading map...
Showing 12 locations