Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "KY1 3NW"

6 unique locations (17 components)

Sort by: Relevance A-Z Components MW Date
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Active • 2028-29 (T-4)
1.05 MW
(De-rated)
Heatherywood Kirkcaldy Fife KY1 3NW (1 component)

20 MW Battery Storage located at Fife.

Inactive • 2021-22 (T-4)
No capacity data
(De-rated)
Heatherywood Road, Kirkcaldy KY1 3NW (4 components)

1hr duration battery storage project.

Active • 2025-26 (T-4), 2022-23 (T-1)
No capacity data
(De-rated)
Heatherywood Road, Kirkcaldy, KY1 3NW (2 components)

1hr Duration battery storage project.

Active • 2027-28 (T-4), 2026-27 (T-4)
2.27 MW
(De-rated)
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility

Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
(De-rated)
Middle Balbeggie Solar Farm, Kirkcaldy, Fife, KY1 3NW (4 components)

The CMU consists of an energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(De-rated)
Loading map...
Showing 6 locations