Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "JOHNSON VIEW WHITELEY FAREHAM HAMPSHIRE PO15"

1 unique locations (1 components)

JOHNSON VIEW WHITELEY FAREHAM HAMPSHIRE PO15 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (57 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.91 MW (Est from CMU) (part of 13.91 MW aggregated CMU)
(Estimated)
BL9 (18 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
96.43 MW (Est from CMU) (part of 96.43 MW aggregated CMU)
(Estimated)
DH2 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
188.49 MW (Est from CMU) (part of 188.49 MW aggregated CMU)
(Estimated)
Land at Sharlands Road, Fareham, Hampshire, PO16 0QQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
6.68 MW (Est from CMU)
(Estimated)
Land west of Blackpit Lane, Awbridge Farm, Lower Penn, Wolverhampton, Staffordshire, WV4 4YA (4 components)
• 1,100MW electricity interconnector between GB and French transmission systems. IFA2 will use a High Voltage Direct Current (HVDC) cable for the connection between Great Britain and France. The electricity must be converted to and from HVDC and the High Voltage Alternating Current (HVAC) used in the domestic electricity transmission systems of Great Britain and France, and this requires a converter station in each country. Cables connect the converter station to a local substation, which transports the electricity onto the domestic network.
• EV charging at residential premises
• New Build Battery Storage Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.17 MW (part of 15.17 MW aggregated CMU)
(Estimated)
Land West of Blackpit Lane, Awbridge Farm, Lower Penn, Wolverhampton, Staffordshire, WV4 4YA (2 components)
• Gas fired reciprocating engines.
• New Build Battery Storage site.
Active • 2028-29 (T-4), 2021-22 (T-4)
9.59 MW (part of 9.59 MW aggregated CMU)
(Estimated)
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW (Est from CMU) (part of 207.87 MW aggregated CMU)
(Estimated)
SK8 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
148.01 MW (Est from CMU) (part of 148.01 MW aggregated CMU)
(Estimated)
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (11 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.16 MW (Est from CMU) (part of 41.16 MW aggregated CMU)
(Estimated)
Loading map...
Showing 10 locations