Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "HR1 4EP"

8 unique locations (48 components)

Sort by: Relevance A-Z Components MW Date
Clay Hill Pit Hereford HR1 4EP (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4), 2018-19 (T-1)
248.97 MW
(Estimated)
Dormington Solar PV Generating Plant, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (2 components)

Existing CMU comprising of Solar PV and associated plant.

Active • 2025-26 (T-1)
4.44 MW (Est from CMU)
(Estimated)
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (9 components)

New Build CMU comprising of Solar PV and associated plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.19 MW (Est from CMU)
(Estimated)
Land at Clay Hill Pit, Dormington, Hereford, HR1 4EP (1 component)

Generation set identifier: FG Wilson / Leroy Somer LL9124L 15 identical low-voltage synchronous generators of the same design and rating (25 MW total capacity) Type of prime mover: diesel engine …

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Land West of Clay Hill Pit Larport farm Larport Lane Dormington Hereford HR1 4EP (1 component)

20 MW Battery Storage facility located at Hereford.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Larport Farm, Clay Hill Pit, Hereford HR1 4EP, UK (2 components)

a 5MW/24MWh lithium Ion battery storage development

Active • 2020-21 (T-4)
No capacity data
(Estimated)
Larport Farm Larport Lane Dormington Hereford HR1 4EP (14 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.43 MW (Est from CMU)
(Estimated)
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
243.40 MW (Est from CMU)
(Estimated)
Loading map...