Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "HAVEN OLD CHURCH ROAD EAST HANNINGFIELD CHELMSFORD ESSEX CM3"

1 unique locations (4 components)

HAVEN OLD CHURCH ROAD EAST HANNINGFIELD CHELMSFORD ESSEX CM3 (4 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.06 MW (Est from CMU) (part of 0.06 MW aggregated CMU)
(Estimated)
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW (Est from CMU) (part of 31264.81 MW aggregated CMU)
(Estimated)
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (14 components)
• Combined Cycle Gas Turbine
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.26 MW (Est from CMU) (part of 16.26 MW aggregated CMU)
(Estimated)
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
• 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Link® will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
• Battery energy storage unit
• Two gas CHP in a horticultural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW (part of 21.52 MW aggregated CMU)
(Estimated)
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (76 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2025-26 (T-1), 2024-25 (T-1) ...
98.70 MW (Est from CMU) (part of 98.70 MW aggregated CMU)
(Estimated)
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Wind Turbine Generators x 15
Active • 2028-29 (T-4), 2027-28 (T-4) ...
64.94 MW (Est from CMU) (part of 64.94 MW aggregated CMU)
(Estimated)
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (13 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.89 MW (Est from CMU) (part of 18.89 MW aggregated CMU)
(Estimated)
Loading map...
Showing 8 locations