Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "FY6"

15 unique locations (60 components)

Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.08 MW (Est from CMU)
(Estimated)
Aldon Road, Poulton - Le - Fylde, Lancashire FY6 8JL (2 components)
• Battery Storage Facilty
• Energy facility comprising of reciprocating engine sets.
Inactive • 2021-22 (T-4)
15.29 MW (Est from CMU)
(De-rated)
BISHOPS CLOSE POULTON-LE-FYLDE FY6 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0042 MW
(Estimated)
Building 2 Aldon Road Business Park, Poulton Le Fylde FY6 8JL (6 components)

New build gas generator

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
8.53 MW
(De-rated)
CARR HEAD LANE POULTON-LE-FYLDE LANCASHIRE FY6 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
14.46 MW
(Estimated)
FY6 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.41 MW
(Estimated)
Park Lane, Preesall, Poulton-le-Flyde, FY6 0LU (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2021-22 (T-4)
18.96 MW
(De-rated)
Park Lane, Preesall, Poulton-le-Flyde, FY6 0LU. (3 components)

Energy facility comprising of reciprocating engine sets.

STOR 146 Ltd Not Prequalified FY6
Inactive • 2020-21 (T-4), 2017-18 (T-1)
18.83 MW
(De-rated)
PARK LANE PREESALL POULTON-LE-FYLDE LANCASHIRE FY6 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
0.0097 MW
(Estimated)
Poulton Power, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

Active • 2024-25 (T-1)
2.84 MW
(Estimated)
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-1)
3.88 MW
(Estimated)
RIVERSIDE DRIVE HAMBLETON POULTON-LE-FYLDE LANCASHIRE FY6 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0042 MW
(Estimated)
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
3.01 MW
(Estimated)
VIEW PILLING LANE PREESALL POULTON-LE-FYLDE LANCASHIRE FY6 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0042 MW
(Estimated)
Loading map...
Showing 14 locations