Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "FORE STREET WESTON HITCHIN HERTFORDSHIRE SG4"

1 unique locations (12 components)

FORE STREET WESTON HITCHIN HERTFORDSHIRE SG4 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
(Estimated)
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (8 components)
• Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• Unproven DSR yet to be procured
Active • 2028-29 (T-4), 2023-24 (T-4) ...
20.13 MW (Est from CMU) (part of 20.13 MW aggregated CMU)
(Estimated)
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Active • 2028-29 (T-4)
3.19 MW
(Estimated)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (7 components)
• 14.700MW CHP located at Cowie, Stirling.
• A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
Active • 2025-26 (T-1), 2023-24 (T-1) ...
4.60 MW (Est from CMU) (part of 4.60 MW aggregated CMU)
(Estimated)
Hunts Cross Shopping Centre Speke Hall Road, Liverpool, L24 9WA (6 components)

Load curtailment

Active • 2025-26 (T-4), 2023-24 (T-1) ...
No capacity data
(Estimated)
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (7 components)
• A New Build 5MW Gas Fuelled Generating Station.
• A New Build 8MW Gas Fuelled Generating Station.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
No capacity data
(Estimated)
Stone Circle, A6, Shap, Cumbria, CA10 3PZ (1 component)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
21.43 MW (Est from CMU)
(Estimated)
Loading map...
Showing 7 locations