Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "FORE STREET WESTON HITCHIN HERTFORDSHIRE SG4"

1 unique locations (12 components)

FORE STREET WESTON HITCHIN HERTFORDSHIRE SG4 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
(De-rated)
350 Petre Street Sheffield S4 8LU (2 components)

New build battery.

Inactive • 2018-19 (T-1)
22.63 MW (Est from CMU)
(De-rated)
350 Petre Street Sheffield S4 8LU (11 components)
• New build battery. (2)
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
165.13 MW (Est from CMU)
(De-rated)
Carlton Forest, Blyth Road, Worksop, S81 0TP (3 components)
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
• A New Build 8MW Fuelled Generating Station.
Inactive • 2021-22 (T-4)
17.07 MW
(De-rated)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (1 component)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Inactive • 2023-24 (T-1)
1.12 MW
(Estimated)
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (3 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Active • 2026-27 (T-4), 2023-24 (T-1)
1.12 MW
(Estimated)
LAND OFF HELEN STREET, GLASGOW, G52 1EE (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2021-22 (T-4)
18.87 MW
(De-rated)
Land off North Road, Vauxhall, Ellesmere Port, CH65 1BA (2 components)

A new build, gas fueled generation station

Active • 2026-27 (T-4), 2025-26 (T-4)
42.90 MW
(Estimated)
Land off Perimeter Road, Ince, Elton, CH2 4RX (2 components)
• A new build, gas fueled generation station
• A new build, gas fuelled generation station.
Active • 2026-27 (T-4), 2025-26 (T-4)
51.92 MW
(Estimated)
Land on south side of Beryl Street, Baldovie Industrial Estate, Dundee, DD4 0HX (1 component)

A new build, gas fuelled generation station.

Inactive • 2022-23 (T-4)
19.03 MW
(De-rated)
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.37 MW
(Estimated)
Loading map...
Showing 11 locations