Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "EX2"

38 unique locations (217 components) - Page 1 of 2

Barrack Road, Exeter, EX2 5DW. (6 components)
• 1.521 MW CHP unit
• Aggregate CMU from multiple sources
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.25 MW (Est from CMU) (part of 5.25 MW aggregated CMU)
(Estimated)
BOUNDARY DRIVE, MARHAMCHURCH, BUDE, CORNWALL, EX23 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
Coaver, Matford Lane, Exeter EX2 4PS (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
County Hall, Topsham Road, Exeter EX2 4QD (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
EX2 (48 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
163.37 MW (Est from CMU) (part of 163.37 MW aggregated CMU)
(Estimated)
EX20 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
128.11 MW (Est from CMU) (part of 128.11 MW aggregated CMU)
(Estimated)
EX22 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.15 MW (Est from CMU) (part of 14.15 MW aggregated CMU)
(Estimated)
EX23 (17 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
51.71 MW (Est from CMU) (part of 51.71 MW aggregated CMU)
(Estimated)
EX24 (6 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
30.90 MW (Est from CMU) (part of 30.90 MW aggregated CMU)
(Estimated)
Exeter ERF, Grace Road South, Exeter EX2 8QE (14 components)
• Energy from Waste Facility located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.53 MW (Est from CMU) (part of 13.53 MW aggregated CMU)
(Estimated)
Grace Road South, Exeter, EX2 8QE (6 components)

Energy from Waste Facility which exports at between 3MW and 3.5MW subject to calorific value of waste and biogenic content.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
Land At Hatchmoor Industrial Estate, Hatherleigh, Okehampton EX20 3LP (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
Land at the Barton, North Tawton EX20 2BB (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
Land Forming Part Of Crediton Road, Okehampton EX20 1SZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW (part of 0.05 MW aggregated CMU)
(Estimated)
Marsh Green Idustrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (9 components)
• Existing OCGT.
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh Salads. All generation unit capacities are nominal and allow for site-specific variations.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
No capacity data
(Estimated)
83.82 MW (part of 83.82 MW aggregated CMU)
(Estimated)
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (8 components)
• A 20MW New Build gas fuelled generating station.
• Existing OCGT.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
128.10 MW (Est from CMU) (part of 128.10 MW aggregated CMU)
(Estimated)
Matford Park Yeoford Way Exeter EX2 8LB (1 component)

Construction of new 20MW power plant, with associated civil works, switchgear and electrical connection

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Matford Park Yeoford Way Exeter EX2 8LB (2 components)

Construction of new 20MW power plant, with associated civil works, switchgear and electrical connection

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Mount Wear Square, Exeter, EX2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (4 components)
• 30MW/30MWh one hour battery
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• On-site existing CHP generating unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
31.22 MW (Est from CMU)
(Estimated)
Parkway, Exeter, Devon, EX2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
Pearse Close, Hatherleigh, Okehampton, EX20 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Active • 2026-27 (T-4)
5.90 MW
(Estimated)
No capacity data
(Estimated)
Loading map...
Showing 25 locations