Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "DY10"

10 unique locations (65 components)

Sort by: Relevance A-Z Components MW Date
Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB (13 components)
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.27 MW
Whitlenge Lane, Hartlebury, Kidderminster, DY10 4JB (2 components)

"Wienerberger Ltd Whitlenge Lane, Hartlebury, Kidderminster, DY10 4JB The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
No capacity data
Asda Kidderminster New Road, New Road , Kidderminster, DY10 1HG (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.30 MW (Est from CMU)
(De-rated)
Beech View LEA CASTLE KIDDERMINSTER DY10 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
No capacity data
Churchill Pumping Station, Stourbridge Road, Ismere, Kidderminster, DY10 3NX (10 components)
• Back up generation
• Onsite generation
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
0.85 MW
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2028-29 (T-4), 2027-28 (T-4) ...
No capacity data
DY10 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
Loading map...
Showing 7 locations