Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "DROVERS WAY NEWTON LONGVILLE MILTON KEYNES MK17"

1 unique locations (9 components)

DROVERS WAY NEWTON LONGVILLE MILTON KEYNES MK17 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
3.60 MW
(Estimated)
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Inactive • 2021-22 (T-4), 2020-21 (T-4)
1095.30 MW
(Estimated)
Hallam way, Old Mill Lane Industrial Estate, Manfield, Woodhouse, Nottingham, NG19 9BG (1 component)

New reciprocating genset in acoustic enclosure.

Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (8 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset

Storage (Duration 1h) Part of SMS Energy Services Limited CARE POWER (NEWTONWOOD) LIMITED DE55
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.91 MW
(Estimated)
Land off Carseview Road, Forfar, DD8 3BS (8 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.83 MW
(Estimated)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
319.68 MW
(Estimated)
Loading map...
Showing 6 locations