Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "DA9 9BB"

2 unique locations (7 components)

Sort by: Relevance A-Z Components MW Date
Crossways, Greenhithe, DA9 9BB (3 components)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
• A Battery Energy Storage System.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.00 MW
(Estimated)
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (4 components)
• Storage equipment to be installed. The storage asset will be built in an existing building.
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Loading map...
Showing 2 locations