Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL"

1 unique locations (8 components)

Clachan Power Station, Cairndow, By Inverary, Argyll, PA26 8BL (8 components)

1 x hydro turbine & synchronous generator

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.62 MW
(Estimated)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (8 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
60.31 MW (Est from CMU)
(De-rated)
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (13 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6342.87 MW
(Estimated)
ENW/Manx Cable Company Bispham Substation, Bristol Avenue, FY2 0FB (4 components)

Data driven activation test for Manx Cable Company coming into the UK.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
53.37 MW
(Estimated)
Medway Power Station, Rochester, Medway, ME3 0AG (25 components)
• Medway
• Medway CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2968.13 MW
(Estimated)
The Loddon Centre, Basingstoke RG24 8QW, UK (2 components)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Inactive • 2018-19 (T-1)
43.17 MW
(De-rated)
To be confirmed (60 components)

To be confirmed

DSR Conditional
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
238.00 MW
(Estimated)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire. Metering of output is Net of auxillary load.
• Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam turbine and associated balance of plant. This will be constructed on a brownfield site at Willington Power Station, Derbyshire.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4445.10 MW
(Estimated)
Loading map...
Showing 8 locations