Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CW9"

21 unique locations (132 components)

Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU (29 components)
• Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising reciprocating engines .This component is one of the engines.
• Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising reciprocating engines This component is one of the engines.
• Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising reciprocating engines. This component is one of the engines.
Inactive • 2023-24 (T-1), 2022-23 (T-1)
99.91 MW (Est from CMU) (part of 99.91 MW aggregated CMU)
(Estimated)
Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising reciprocating engines .This component is one of the engines. (2 components)

Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising reciprocating engines .This component is one of the engines.

Inactive • 2023-24 (T-1)
15.08 MW (Est from CMU) (part of 15.08 MW aggregated CMU)
(Estimated)
29 Leicester Street, Barons Quay, Northwich, CW9 5LG (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
No capacity data
(Estimated)
Asda Barons Quay, Northwich, 29 Leicester Street, Barons Quay, Northwich, CW9 5LG (11 components)
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
438.95 MW (Est from CMU) (part of 438.95 MW aggregated CMU)
(Estimated)
CW9 (30 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
118.09 MW (Est from CMU) (part of 118.09 MW aggregated CMU)
(Estimated)
CW9 8HZ (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW (Est from CMU) (part of 39.94 MW aggregated CMU)
(Estimated)
GRIFFITHS ROAD, LOSTOCK GRALAM, CW9 7XU (4 components)

gas generation

Inactive • 2020-21 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (11 components)
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
• 6MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
74.78 MW (Est from CMU) (part of 74.78 MW aggregated CMU)
(Estimated)
Land east of Griffiths Road, Northwich, CW9 7PL (1 component)

2 x 2.5 MW gas fuelled generators installed on land east of Griffiths Road.

Inactive • 2023-24 (T-4)
4.75 MW (Est from CMU) (part of 4.75 MW aggregated CMU)
(Estimated)
Lostock Hollow, Lostock Gralam, Northwich CW9 7PA, UK (2 components)
• 16MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution and gas network.
• New build battery
Inactive • 2021-22 (T-4), 2020-21 (T-4)
No capacity data
(Estimated)
Lostock Works Griffiths Road Lostock Gralam Northwich CW9 7FA (1 component)

Twin boiler, single steam turbine energy from waste plant exporting at 132kV

Active • 2024-25 (T-4)
59.27 MW
(Estimated)
Vacant Land, Griffiths Road, Lostock Gralam, CW9 7XU (2 components)

20 MW power plant comprising 10 x 2MW gas reciprocating engines. Power plant will be connected to the SP distribution network and local gas network.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
Vacant Land, Griffiths Road, Lostock Gralam, Northwich CW9 7ZR (1 component)

20 MW power plant comprising 10 x 2MW gas reciprocating engines. The power plant will be connected to the local electricity distribution network and local gas network.

Inactive • 2018-19 (T-1)
No capacity data
(Estimated)
Venables Road Great Britain Northwich CW9 5RT (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
WATERS EDGE ANDERTON NORTHWICH CHESHIRE CW9 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
125.99 MW (Est from CMU) (part of 125.99 MW aggregated CMU)
(Estimated)
Wincham Lane, Wincham, Northwich, CW9 6DE (15 components)
• N/A
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
BADGER BROOK, BROXBURN, WEST LOTHIAN, EH52 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
Farm North Lane Lincoln Lincolnshire LN5 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW (Est from CMU) (part of 14.29 MW aggregated CMU)
(Estimated)
Loading map...
Showing 18 locations