Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CV6"

9 unique locations (72 components)

Asda Coventry Jubilee Crescent, Jubilee Cresecnt Radford, Coventry, CV63EX (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW (Est from CMU) (part of 18.11 MW aggregated CMU)
(Estimated)
Capmartin Road, Coventry, West Midlands, CV6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
CV6 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
41.99 MW (Est from CMU) (part of 41.99 MW aggregated CMU)
(Estimated)
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.64 MW (Est from CMU) (part of 22.64 MW aggregated CMU)
(Estimated)
Milver Metals, Rowleys Green Industrial Estate, Coronel Ave, Coventry CV6 6AP (23 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.00 MW (Est from CMU) (part of 4.00 MW aggregated CMU)
(Estimated)
WINDMILL ROAD, COVENTRY, CV6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
OMBERSLEY ROAD WORCESTER WORCESTERSHIRE WR3 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
Loading map...
Showing 7 locations