Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CT9"

10 unique locations (26 components)

Sort by: Relevance A-Z Components MW Date
Boots, Margate High St - South and East Kent CT9 1JN (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.0038 MW (Est from CMU)
(De-rated)
CT9 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.04 MW
(De-rated)
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (6 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
4.76 MW
(Estimated)
Land at Strasbourg St, Westwood Industrial Estate, Margate CT9 4JP (1 component)

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
No capacity data
Land at Strasbourg St, Westwood Industrial Estate, Margate, Kent, CT9 4JF (8 components)
• 20.7MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20.7MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Margate, Kent, CT9 4JJ

This location is balancing reserve only by Statkraft and contains a unit using gas reciprocating engines.

BR Only
Springfield Road, Kent, Margate, CT9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
St. Peters Road, Margate, Kent, CT9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
STRASBOURG STREET, MARGATE, CT9 4JF (1 component)

gas generation

Inactive • 2020-21 (T-4)
No capacity data
THE RIDGEWAY, MARGATE, KENT, CT9 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
0.04 MW
Loading map...
Showing 10 locations