Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CO6"

10 unique locations (116 components)

BUXTON ROAD COGGESHALL COLCHESTER ESSEX CO6 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
128.00 MW (Est from CMU) (part of 128.00 MW aggregated CMU)
(Estimated)
CO6 (56 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
156.38 MW (Est from CMU) (part of 156.38 MW aggregated CMU)
(Estimated)
EARLS COLNE WW EARLS COLNE, CO6 2ER (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1)
No capacity data
(Estimated)
EARLS COLNE WW EARLS COLNE, CO6 2NA (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
17.03 MW (Est from CMU) (part of 17.03 MW aggregated CMU)
(Estimated)
Great Horkesley WW, GT HORKESLEY-TOGGS LA WTW, Tog Lane, Gt Horkesley, COLCHESTER, CO6 4BX (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Nayland-Pops Bridge WS, NAYLAND-POPS BRIDGE BS Off A134, Pops Bridge, Gt Horkesley, COLCHESTER, CO6 4JN, (6 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2023-24 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Spring Gardens Road, Colchester, Essex, CO6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
(Estimated)
BB4 (23 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
96.92 MW (Est from CMU) (part of 96.92 MW aggregated CMU)
(Estimated)
Loading map...
Showing 8 locations