Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CM7"

27 unique locations (89 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• Load reduction
• Load reduction.
Active • 2025-26 (T-4), 2022-23 (T-4) ...
No capacity data
BOCKING - WW, CHURCH LANE, CM7 5SQ (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
No capacity data
Boots, Braintree George Yard Sc - Suffolk CM7 1RB (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.0038 MW (Est from CMU)
(De-rated)
Braintree STW, BRAINTREE STW, Skitts Hill, BRAINTREE Essex, CM7 1AU (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
BRAINTREE STW, Park Drive, Skitts Hill, Braintree, Essex, CM7 1NB (4 components)

Diesel Generator, Perkins, 3012TAC

Inactive • 2017-18 (T-1), 2016-17 (TR)
0.72 MW
Brook Close, Braintree, Essex, CM7 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
No capacity data
CM7 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
(De-rated)
CM77 (4 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.03 MW
(De-rated)
Covenbrook Hall, Stisted, Braintree, Essex, CM77 8AJ (1 component)

A new build diesel fuelled generating station.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Cressing Reservoir, Lanham Green, Cressing, CM77 8DT (2 components)

Diesel Generator

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Cressing WB, Braintree PZ - Cressing, Lanham Green, Cressing, BRAINTREE Essex, CM77 8DT, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
CUCKOO WAY GREAT NOTLEY BRAINTREE ESSEX CM77 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW (Est from CMU)
(Estimated)
DAPHNE CLOSE GREAT NOTLEY BRAINTREE ESSEX CM77 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.02 MW (Est from CMU)
(Estimated)
GT BARDFIELD-BOREHOLE 3, HAWKSPUR GREEN LITTLE BARDFIELD, CM7 4SH (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
No capacity data
(Estimated)
HIGHCLERE ROAD GREAT NOTLEY BRAINTREE ESSEX CM77 (1 component)

EV charging at residential premises

Inactive • 2027-28 (T-4)
0.01 MW
High Garrett, Sisted, Braintree, Essex, CM77 8BX (2 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 … (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
(Official)
Hill Hall Solar Farm, Little Bardfield, Braintree, Essex, CM7 4SH (3 components)

The CMU consists of a battery energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Inactive • 2022-23 (T-4)
No capacity data
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.91 MW
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2025-26 (T-1)
15.48 MW
SKYLINE, BRAINTREE ESSEX CM77 7AH (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
No capacity data
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (13 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
1.86 MW
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
0.05 MW
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (3 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Loading map...
Showing 25 locations