Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "CHERRY TREE WALK BARLBY SELBY YO8"

1 unique locations (11 components)

CHERRY TREE WALK BARLBY SELBY YO8 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
151.26 MW (Est from CMU) (part of 151.26 MW aggregated CMU)
(Estimated)
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Aggregate CMU from multiple sources
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (12 components)
• 4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Hanover Place Sunderland SR4 6BY (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
No capacity data
(Estimated)
Hanover Place Sunderland SR4 6BY (7 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2022-23 (T-1) ...
1.90 MW (Est from CMU) (part of 1.90 MW aggregated CMU)
(Estimated)
Marsh Leys, Woburn Rd, MK43 9AB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
No capacity data
(Estimated)
New Droppingwell Road Rotherham S61 2DL (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2019-20 (T-1)
No capacity data
(Estimated)
New Droppingwell Road Rotherham S61 2DL (7 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Union Street, rotherham, S61 1AB *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (2 components)
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon Power Station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical i.e. 12MW for each of unit 1 and unit 2
• New reciprocating genset in acoustic enclosure
Active • 2024-25 (T-4), 2022-23 (T-4)
No capacity data
(Estimated)
Unit D, Kendale Rd, Scunthorpe DN16 1DT (17 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Unit D Kendale Road Scunthorpe DN16 1DT (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Unit D Kendale Road Scunthorpe DN16 1DT (8 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2020-21 (T-1) ...
3.81 MW (Est from CMU) (part of 3.81 MW aggregated CMU)
(Estimated)
Loading map...
Showing 12 locations