Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "British Gas, New Bridge Ln, Stockport, SK1 2HQ"

1 unique locations (24 components)

British Gas, New Bridge Ln, Stockport, SK1 2HQ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR Part of Centrica Plc GB GAS HOLDINGS LIMITED SK1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
6.35 MW
(Estimated)
Black Law Windfarm, Climpy, Forth, B715, South Lanarkshire ML11 8EW (1 component)

An onshore windfarm of 54 x 2.3MW Wind Turbine Generators with a generating capacity of 124MW and an optimised Transmission Entry Capacity of 118MW.

Onshore Wind Part of SCOTTISHPOWER RENEWABLE ENERGY LIMITED SCOTTISHPOWER RENEWABLES (UK) LIMITED ML11
Active • 2028-29 (T-4)
7.83 MW
(Estimated)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Storage (Duration 1h) Part of SCOTTISHPOWER RENEWABLE ENERGY LIMITED SCOTTISHPOWER RENEWABLES (UK) LIMITED KA6
Active • 2026-27 (T-4)
3.54 MW
(Estimated)
Kingrigg, Newby Cross, Carlisle, Cumbria, CA5 6JP (1 component)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4)
No capacity data
(De-rated)
Land At Glassthorpe Hill & Land Off Brington Road Flore Northamptonshire, NN7 3NF (2 components)

CMU is a photovoltaic system

Solar Photovoltaic Part of EDF EN UK Limited EDF ENERGY RENEWABLES LIMITED Not Prequalified NN7
Active • 2028-29 (T-4), 2027-28 (T-4)
2.60 MW
(Estimated)
Land North of Goodrest Farm, Illey Lane, Hunnington, Halesowen, B62 0JL (2 components)

New Build storage facility

Storage (Duration 4h) Part of GRENERGY RENOVABLES S.A GRENERGY RENEWABLES UK LIMITED Not Prequalified B62
Active • 2028-29 (T-4)
29.22 MW
(Estimated)
Land off Bowbridge Lane, Balderton, Newark NG24 3BY (7 components)
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear located at Bowbridge Lane
• ... and 1 more unique description
Reciprocating engines Part of FPC Electric Land Limited EL (Newark) Limited NG24
Active • 2025-26 (T-4), 2024-25 (T-4) ...
13.31 MW
(Estimated)
Land To The East and West Of Lanhams, Lanham Farm Road, Cressing, Essex CM77 8DX (1 component)

CMU is a photovoltaic system

Solar Photovoltaic Part of EDF EN UK Limited EDF ENERGY RENEWABLES LIMITED Not Prequalified CM77
Active • 2028-29 (T-4)
3.04 MW
(Estimated)
North of Moniaive A702, Dumfries & Galloway DG7 3UG (1 component)

An onshore windfarm of 14x1.3 MW Wind Turbine Generator with an exports capacity of 18.2 MW.

Onshore Wind Part of SCOTTISHPOWER RENEWABLE ENERGY LIMITED SCOTTISHPOWER RENEWABLES (UK) LIMITED DG7
Active • 2028-29 (T-4)
1.21 MW
(Estimated)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (22 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.36 MW
(Estimated)
Loading map...
Showing 10 locations