Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BS40"

18 unique locations (101 components)

Chew Stoke, Bristol, BS40 8XS (3 components)

"Bristol Water Plc Chew Stoke, Bristol, BS40 8XS The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes …

Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED BS40
Inactive • 2017-18 (TR)
No capacity data
(De-rated)
Station Road, Blagdon, Bristol, BS40 7UN (3 components)

"Bristol Water Plc Station Road, Blagdon, Bristol, BS40 7UN The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency …

Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED BS40
Inactive • 2017-18 (TR)
No capacity data
(De-rated)
BS40 (18 components)
• Domestic EV charger
• Domestic demand turn down
DSR Part of Octopus Energy Group Limited AXLE ENERGY LIMITED BS40
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.48 MW
(Estimated)
BS40 9UR (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
(Estimated)
BW016, Chew Magna, Winford Road, Chew Magna, Bs18, BS40 8QQ (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED BS40
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
(Estimated)
BWW013, Blagdon, Station Road, Blagdon, Bristol, BS40 7UN (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED BS40
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
(Estimated)
BWW017, Chew Stoke, Chew Stoke Pump Station, Chew Stoke, Bristol, BS40 8XS (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR Part of ENEL X INTERNATIONAL S.R.L. ENEL X UK LIMITED BS40
Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.61 MW
(Estimated)
Loading map...
Showing 7 locations