Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BB7"

20 unique locations (88 components)

Shawhouse Farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (3 components)
• 10 x 2 MW Gas fuelled engines with connections to the distribution and gas networks. The engines will be sited on a compound at Shawhouse Farm, Clitheroe, BB7 9AD
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
BANKFIELD QUARRY, PIMLICO, CLITHEROE, LANCASHIRE, BB7 4QA (5 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• Two gas CHP engines in commercial horticultural environment with no auxilliary load
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
No capacity data
(Estimated)
BB7 (32 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
68.01 MW (Est from CMU) (part of 68.01 MW aggregated CMU)
(Estimated)
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (2 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines
• A new power plant, with associated civil works, switchgear and electrical connection.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
No capacity data
(Estimated)
Ribblesdale (1620000847420). Distribution ID: 850 Ribblesdale Works Clitheroe, BB7 4QF (2 components)

Hanson crushing and mills processes

Inactive • 2022-23 (T-1)
No capacity data
(Estimated)
Ribblesdale (1620000847420). Distribution ID: 850 Ribblesdale Works Clitheroe, BB7 4QF (2 components)

Hanson crushing and mills processes

Inactive • 2022-23 (T-1)
No capacity data
(Estimated)
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (1 component)

Proven reduction of site conumption

Active • 2025-26 (T-1)
4.35 MW (Est from CMU) (part of 4.35 MW aggregated CMU)
(Estimated)
Ribblesdale Cement Works, West Bradford Road, Clitheroe, BB7 4QF (19 components)
• Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 MW as per the 3 highest export peaks
• Hanson 2 - DSR Turn Down/ Load Reduction
• Storage facility
Active • 2024-25 (T-1), 2023-24 (T-4) ...
16.35 MW (Est from CMU) (part of 16.35 MW aggregated CMU)
(Estimated)
Ribblesdale Works, West Bradford Road, Clitheroe, BB7 4QF (3 components)

Onsite demand reduction and load shifting at cement works

Inactive • 2020-21 (T-1)
No capacity data
(Estimated)
Shawhouse farm, Clitheroe Road, Clitheroe, Lancashire, BB7 9AD (4 components)
• 2 X 2MW gas fuelled engines installed on a compound at Shawhouse farm.
• 4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• Water treatment centre
Inactive • 2022-23 (T-4), 2021-22 (T-4)
No capacity data
(Estimated)
Wilkin Bridge Moor Lane Great Britain BB7 1BE (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
Colvin Chase, Chelmsford, Essex, CM2 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
No capacity data
(Estimated)
KILVERTS VIEW CLYRO HEREFORD HEREFORDSHIRE HR3 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
WALKDEN AVENUE EAST WIGAN LANCASHIRE WN1 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW (Est from CMU) (part of 14.29 MW aggregated CMU)
(Estimated)
Loading map...
Showing 15 locations