Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "BA3"

16 unique locations (146 components)

BA3 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
139.19 MW (Est from CMU) (part of 139.19 MW aggregated CMU)
(Estimated)
BWW019, Coley, Coley Road, Coley, East Harptree, BA3 4PW (16 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.70 MW (Est from CMU) (part of 4.70 MW aggregated CMU)
(Estimated)
BWW028, Sperrings Green, Chewton Mendip, Chewton Mendip, BA3 4LN (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.31 MW (Est from CMU) (part of 7.31 MW aggregated CMU)
(Estimated)
HIGHBURY STREET COLEFORD RADSTOCK BA3 (2 components)

EV charging at residential premises

Active • 2027-28 (T-4)
No capacity data
(Estimated)
John Wainwright Moonshill Quarry Stoke Hill Stoke St Michael Radstock BA3 5JU (2 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
John Wainwright Moonshill Quarry Stoke Hill Stoke St Michael Radstock BA3 5JU (3 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (10 components)
• Existing CMU comprising of battery storage and associated plant
• Load reduction upon instruction
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.88 MW (Est from CMU) (part of 13.88 MW aggregated CMU)
(Estimated)
Land on the east side of Cole's Lane, Chewton Mendip, BA3 4BY (1 component)

49.950 MW pumped storage facility in Gwynedd, North Wales.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Land on the North Side of Radstock Road BA3 2BB  (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-3), 2020-21 (T-1)
No capacity data
(Estimated)
Land on the North Side of Radstock Road BA3 2BB (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW (Est from CMU) (part of 13.31 MW aggregated CMU)
(Estimated)
Mill Rd, Radstock BA3 5TT (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-1)
2.86 MW (Est from CMU) (part of 2.86 MW aggregated CMU)
(Estimated)
Mill Rd, Radstock BA3 5TT, United Kingdom (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.22 MW (Est from CMU) (part of 21.22 MW aggregated CMU)
(Estimated)
MOONSHILL QUARRY, STOKE HILL, STOKE ST. MICHAEL, RADSTOCK, BA3 5JU (10 components)
• 0.1MW of demand reduction
• 3MW of DSR
• A Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Newbury Works, Coleford, Radstock, BA3 5RX (1 component)

New build gas reciprocating multi-engine generating plant

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
SO18 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
43.31 MW (Est from CMU) (part of 43.31 MW aggregated CMU)
(Estimated)
Loading map...
Showing 15 locations