Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Asda Wolstanton, Wolstanton Retail Park ST5 0AP"

0 unique locations (0 components)

Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (1 component)

49.990 MW battery energy storage system at Richborough Energy Park

Storage (Duration 1h) Part of SOSTENEO BESS 1 (UK) LIMITED RICHBOROUGH ENERGY PARK LIMITED CT13
Inactive • 2023-24 (T-1)
9.30 MW
(Estimated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (1 component)

The CMU TEES16 consists of two identical components. TEES16-2 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The …

Part of P3P Teesside Holdings Limited SPARK STEAM LIMITED TS23
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (1 component)

The CMU TEES16 consists of two identical components. TEES16-1 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The …

Part of P3P Teesside Holdings Limited SPARK STEAM LIMITED TS23
Inactive • 2017-18 (T-1)
No capacity data
(De-rated)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (6 components)
• The CMU TEES16 consists of two identical components. TEES16-1 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The new development is expected to run about 4,000 hours p.a. and will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU TEES16 consists of two identical components. TEES16-2 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The new development is expected to run about 4,000 hours p.a. and will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Part of P3P Teesside Holdings Limited SPARK STEAM LIMITED TS23
Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
Unproven DSR yet to be procured (58 components)

Unproven DSR yet to be procured

DSR Part of Scottish Power Generation Holdings Limited ScottishPower Energy Retail Limited
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Loading map...
Showing 5 locations