Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Asda Wath Upon Dearne, 107/111 High Street Wath Upon Dearne, Rotherham, S63 7PX"

1 unique locations (11 components)

Asda Wath Upon Dearne, 107/111 High Street Wath Upon Dearne, Rotherham, S63 7PX (11 components)
• Load curtailment
• Load curtailment from refridgeration
DSR Part of RESERVE POWER HOLDINGS (JERSEY) LIMITED FLEXITRICITY LIMITED S63
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.75 MW
(Estimated)
Duniface Farm, Windygates, Fife, KY8 5RH (1 component)

New build Battery Energy Storage CMU

Storage (Duration 2h) Part of Forsa Energy (Beryl Street) Holdings Limited BERYL STREET GENERATION LIMITED KY8
Active • 2028-29 (T-4)
3.19 MW
(Estimated)
Eyre Street, Birmingham, B18 7AD (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines Part of PJ Holdings Limited EYRE STREET POWER LIMITED Not Prequalified B18
Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.67 MW
(Estimated)
Shirland Lane, Greenland, Sheffield, S9 3FF (1 component)

A new build, gas fuelled generation station.

Reciprocating engines Part of Forsa Energy Cm Holdings Limited BAKER STREET GENERATION LIMITED Not Prequalified S9
Active • 2024-25 (T-4)
17.52 MW
(Estimated)
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system
• A new build, gas fueled generation station.
Reciprocating engines Storage (Duration 2h) Part of Forsa Energy Cm Holdings Limited BAKER STREET GENERATION LIMITED Not Prequalified L24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.09 MW
(Estimated)
Stone Circle, A6, Shap, Cumbria, CA10 3PZ (2 components)

A new build, gas fuelled generation station.

Reciprocating engines Part of Forsa Energy Cm Holdings Limited FORSA ENERGY (BERYL STREET) HOLDINGS LIMITED Not Prequalified CA10
Active • 2024-25 (T-4)
21.43 MW
(Estimated)
Loading map...
Showing 6 locations