Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Asda Strelley, Strelley Road NG8 3AP"

0 unique locations (0 components)

Land east of Nottingham Road, Loughborough, Leicestershire, LE11 1ET (2 components)

3 X 2MW gas fuelled generators installed on a compound on land east of Nottingham Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Land west of Cheston Road, Birmingham, B7 5EU (2 components)

3 x 2MW gas fuelled generator units to be installed on a compound on industrial land west of Cheston Road.

Inactive • 2023-24 (T-4)
5.70 MW (Est from CMU) (part of 5.70 MW aggregated CMU)
(Estimated)
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
• Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.
• New reciprocating gensets in acoustic enclosure
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Mill Lane, Kirkby in Ashfield, NG17 9LG (3 components)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
No capacity data
(Estimated)
Private Road No.5, Colwick, Nottingham, NG4 2JU *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (4 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• New reciprocating genset in acoustic enclosure
Inactive • 2020-21 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
Weighbridge Road, Shotton, Deeside, CH5 2LL (20 components)
• A gas fuelled generating station.
• Paper mill industrial site
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
48.00 MW (Est from CMU) (part of 48.00 MW aggregated CMU)
(Estimated)
Loading map...
Showing 7 locations