Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "ASDA Depot Falkirk CDC, New Bankside, Abbots Wynd FK2 7XP"

1 unique locations (13 components)

ASDA Depot Falkirk CDC, New Bankside, Abbots Wynd FK2 7XP (13 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
20.36 MW (Est from CMU) (part of 20.36 MW aggregated CMU)
(Estimated)
15.03 MW (part of 15.03 MW aggregated CMU)
(Estimated)
First Renewable Alpha Limited, Newton Road, Penrith CA11 0AB (3 components)

a new build diesel and/or gas dual fuel generating station consisting of 10 generator units of 2 MW.

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (4 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• Gas fuelled generation plant
Inactive • 2023-24 (T-4), 2023-24 (T-1)
27.90 MW (Est from CMU)
(Estimated)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (9 components)
• New build battery storage 50.000MW/50.000MWh one hour duration asset
• To be confirmed once components are known
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.10 MW (Est from CMU) (part of 37.10 MW aggregated CMU)
(Estimated)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.39 MW (Est from CMU) (part of 31.39 MW aggregated CMU)
(Estimated)
North Avenue, Marston Green, Birmingham, B40 1NT (19 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.83 MW (Est from CMU) (part of 5.83 MW aggregated CMU)
(Estimated)
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (2 components)

New Build Storage Facility

Active • 2028-29 (T-4)
75.13 MW
(Estimated)
Loading map...
Showing 9 locations