Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

4237 unique locations (20165 components) - Page 5 of 170

Sort by: A-Z Components MW Date
63 to 69 Duke Street, Luton, Bedfordshire, LU2 0HH (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
64 Newman Street, London W1T 3EF (3 components)

Battery/generator UPS

Inactive • 2018-19 (T-1)
No capacity data
(Estimated)
670 Ajax Avenue, Slough, SL1 4BG (5 components)

DSR Component providing load turn down at a data centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.16 MW (Est from CMU)
(Estimated)
6 Braham St Aldgate London E1 8EE (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
6 Braham St, Aldgate, London, E1 8EE (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
6 Kiln, Kilms Business Park LE10 3EQ (5 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the WPD distribution network and local gas network.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(Estimated)
700 Waterside Drive, Aztec West Almondsbury, Bristol, BS32 4ST (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
70 Wrecclesham Hill, Farnham, Surrey GU10 4JX (2 components)

A new build Battery Energy Storage System

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
77 Oldham Road, Manchester, Lancashire M4 5AA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
7 Tartraven Place, Broxburn, West Lothian EH52 5LT (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
88 Coventry Road Broughton Astley Leicester LE9 6QA (11 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
91 Chesterfield Rd, Lichfield WS13 6QW (1 component)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
975 Mollison Avenue EN3 7NN (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2018-19 (T-1)
No capacity data
(Estimated)
97 Talbot Road, Stretford, Manchester, Lancashire M16 0TW (11 components)

Office site with behind the meter back up generation

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
0.81 MW (Est from CMU) (part of 0.81 MW aggregated CMU)
(Estimated)
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (4 components)

Offsite with behind the meter generation

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
9A Parker Ave Felixstowe IP11 4AD (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
9A Parker Avenue Felixstowe IP11 4AD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
9A Parker Avenue Felixstowe IP11 4AD (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
9 Greycaine Road, Watford, Watford, WD24 7GP (3 components)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (11 components)

A new build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
No capacity data
(Estimated)
A1085, Middlesbrough TS6 7HJ (8 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
No capacity data
(Estimated)
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (4 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Inactive • 2022-23 (T-4), 2021-22 (T-4)
No capacity data
(Estimated)
A1(M), Letchworth Garden City, SG6 2ER (3 components)

New 20MW gas-fired facility, metered on the distrbution network boundary using a COP2 meter with no auxilliary load on site

Inactive • 2018-19 (T-1)
No capacity data
(Estimated)
A38 Gloucester Road, Filton, Bristol, South Gloucestershire, BS34 7QE (9 components)

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
A65, Kirby Lonsdale, Carnforth, LA6 2HH (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Loading map...
Showing 25 locations