Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

5644 unique locations (21715 components) - Page 190 of 226

Southmoor Lane Havant Hampshire PO9 1JW (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Southmoor Lane Havant Hampshire PO9 1JW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4)
No capacity data
(Estimated)
Southmoor Lane Havant PO9 1JW (1 component)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
No capacity data
(Estimated)
South Pargillis, Clockluine Road, Hillend, Dunfermline, KY11 7HS (1 component)

Energy facility comprising of reciprocating engine sets.

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
No capacity data
(Estimated)
South Road Highton Street, Sheffield, S6 3TD (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
No capacity data
(Estimated)
South Row, Milton Keynes, MK9 1DL (4 components)

"Planet Ice - UK South Row, Milton Keynes, MK9 1DL The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
No capacity data
(Estimated)
South Street , Brighton, BN15 8AG (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
No capacity data
(Estimated)
South Street Cottingham North Humberside HU16 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
Sovereign Enterprise Centre, Warrington Road, Wigan, WN1 3AB (2 components)

4 x 2MW gas gen sets

Inactive • 2020-21 (T-4)
No capacity data
(Estimated)
Sovereign Flour Mill, Brunel Rd, CORBY, Northants, NN17 4SL (6 components)
• Flour Mill
• Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1.21 MW (Est from CMU) (part of 1.21 MW aggregated CMU)
(Estimated)
SP4 7BE (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
SP5 3EU (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
(Estimated)
Spalding Road Bourne Lincolnshire PE10 0AT (2 components)

Greenhouse heb farming

Inactive • 2017-18 (TR)
No capacity data
(Estimated)
Spalding STW, SPALDING STW, West Marsh Road, SPALDING Lincolnshire, PE11 2BB, (7 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
(Estimated)
Spawd Bone Lane, Knottingley, WF11 0HP (3 components)

"ARDAGH GLASS LTD Spawd Bone Lane, Knottingley, WF11 0HP The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
No capacity data
(Estimated)
Speke Operations, Fleming Rd, Liverpool L24 9LN (9 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
SPENCEFIELD LANE LEICESTER LE5 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
SPILLERS MILLING TD AVONMOUTH DOCK BRISTOL BS11 9DL (3 components)

Flour milling

Inactive • 2017-18 (TR)
No capacity data
(Estimated)
Spinney Lea Ashbourne Derbyshire DE6 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
(Estimated)
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (2 components)
• CMU consisting of a gas reciprocating engine and alternator
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
No capacity data
(Estimated)
Sports Direct Land Off Meadow Lane, Shirebrook, Mansfield, Derbyshire NG20 8RY (1 component)

Hanson 2 - DSR Turn Down/ Load Reduction

Inactive • 2022-23 (T-3)
No capacity data
(Estimated)
Springdale Road Aberdeen Aberdeenshire AB15 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
(Estimated)
Loading map...
Showing 25 locations