Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "Equivalence Energy, Customs House, Ipswich Docks, Ipswich, Suffolk, IP3 0DP"

1 unique locations (6 components)

Equivalence Energy, Customs House, Ipswich Docks, Ipswich, Suffolk, IP3 0DP (6 components)

CMU Component is 500kVA reciprocating diesel engine.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
No capacity data
(De-rated)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk (7 components)
• A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.
• Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
37.92 MW
(De-rated)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (1 component)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive • 2019-20 (T-1)
19.03 MW
(De-rated)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (2 components)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive • 2019-20 (T-1)
19.03 MW
(De-rated)
Plot A Land at Severn Road Avonmouth BS10 7SE (7 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 25 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• ... and 1 more unique description
Active • 2025-26 (T-4), 2024-25 (T-4) ...
142.55 MW
(Estimated)
Loading map...
Showing 5 locations