All Locations
5236 unique locations (20229 components) - Page 1 of 210
100 Princes Road Hulme, Manchester, M15 5AS (4 components)
Load curtailment (3)
100 The Jewel, Brunstane, Edinburgh, EH15 3AR (4 components)
Load reduction on site supported by non-exporting standby generation. (3)
1020 CENTRE PARK, WARRINGTON WA1 1QL (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
1020 CENTRE PARK, WARRINGTON WA1 1QY (1 component)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
1020 CENTRE PARK, WARRINGTON WA1 1QY (3 components)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network. (2)
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (4 components)
gas generation (3)
105 Kelynmead Road Sheldon, Birmingham, B338LF (4 components)
Load curtailment (3)
106 Scrubs Lane, Willesden, NW10 6QY (3 components)
"EMR European Metal Recycling 106 Scrubs Lane, Willesden, NW10 6QY The CMU Component reduces import demand by turning off equipment and other non-essential loads."
107/111 High Street Wath Upon Dearne, Rotherham, S63 7PX (4 components)
Load curtailment (3)
108/110 High Street Strood, Kent, ME2 4TR (4 components)
Load curtailment (3)
1092 Ransomes Way, Ipswich IP3 8TF, UK (1 component)
16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
10 Queens Drive , Kilmarnock, KA1 3XF (4 components)
Load curtailment (3)
110-114 High Street , Hoddesdon, EN118HD (4 components)
Load curtailment (3)
1-10 Queen Elizabeth Square - South Woodham Ferrer CM3 5SY (4 components)
Load drop (2)
111 Brancroft Way Enfield Middlesex EN3 7PL (2 components)
Enfield CCGT Power Station - (one unit station)
112 Beddington Lane, Beddington CR0 4TB (8 components)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
112 Beddington Lane, Croydon, CR0 4TB (1 component)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
118 Forest Road New Ollerton, Newark, NG229PL (4 components)
Load curtailment (3)
120 London Wall, London EC2Y 5ET (3 components)
This is an office building with large chillings
125 Cheston Road Birmingham B7 5EA (1 component)
Energy centre comprising of lean burn, acoustically treated natural gas reciprocating engines.
125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (2 components)
Load reduction on-site and standby generation
126 Smithdown Road , Liverpool, L15 3JR (4 components)
Load curtailment (3)