Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

93 unique locations (688 components) - Page 1 of 4

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
195 Aylesone Rd, Leicester LE2 7QJ (29 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)
• Combined Cycle Gas Turbine
• Water treatment centre
Inactive • 2022-23 (T-3), 2020-21 (T-4)
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
40 Burrowfields, Welwyn Garden City, Hertfordshire, AL7 4SR (4 components)

6 MW power plant comprising a series of gas reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1)
7 Tartraven Place, Broxburn, West Lothian EH52 5LT (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build 7.5MW gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
97 Talbot Road, Stretford, Manchester, Lancashire M16 0TW (12 components)
• A gas fuelled generating station.
• Office site with behind the meter back up generation
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)
• Offsite with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Albion Road, Dartford, Kent, DA1 5PZ (12 components)

battery storage

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (7 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Ashton Old Road, Manchester, Greater Manchester, M11 1AA. (5 components)

Energy facility comprising of reciprocating engine sets.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)
• Combined Cycle Gas Turbine plant
• N/A
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Black Rock Pumping Station, Windwhistle Rd, Weston-super-Mare BS23 4PD (12 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Blackshaw Rd, London SW17 0QT (9 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
Boiler House, Central Manchester University Hospital, Oxford Road, Manchester M13 9WL, UK (4 components)
• A 20MW New Build Battery Storage site
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The Prospective Generating Unit will be an Edina TCG 2032B V16 4.5MWe CHP Gas Engine (or similar) situated on Central Manchester University Hospital site.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bridge Road, Wrexham Industrial Estate, LL13 9PS (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
British Gas, Housesteads, Off Stockport Road, Hattersley, SK14 3QU (5 components)
• Office site with behind the meter back-up generation.
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
British Gas, New Bridge Ln, Stockport, SK1 2HQ (20 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Budds Plantation Paices Hill Aldermaston RG7 4PJ (3 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (5 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 25 locations