Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CARGILL PLC

3 unique locations (14 components)

Active MW: 244.97 MW
Inactive MW: 109.79 MW
Address: Port of Liverpool CHP Plant, Regent Road, Bootle, Liverpool L20 1ED (5 components)
• Diesel Generator, Perkins, 4008TAG2A
• Small gas-fired CCGT
Inactive • 2016-17 (TR)
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (6 components)
• Solar T70 Based CHP System
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (3 components)
• CMU consisting of a gas reciprocating engine and alternator
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Solar T70 Based CHP System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 3 locations