Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

129 unique locations (670 components) - Page 1 of 6

Sort by: A-Z Components MW Date
No capacity data
(Estimated)
Aberdeen Garthdee Rd Rp - Aberdeen and Angus AB10 7AY (1 component)

Commercial sites

Active • 2024-25 (T-1)
6.78 MW (part of 6.78 MW aggregated CMU)
(Estimated)
0.15 MW (Est from CMU)
(Estimated)
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (17 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
9.84 MW (Est from CMU) (part of 9.84 MW aggregated CMU)
(Estimated)
0.22 MW (Est from CMU) (part of 0.22 MW aggregated CMU)
(Estimated)
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (28 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.71 MW (Est from CMU) (part of 7.71 MW aggregated CMU)
(Estimated)
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (3 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.78 MW (Est from CMU) (part of 2.78 MW aggregated CMU)
(Estimated)
Aylesbury - West Herts HP20 1ST (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.30 MW (part of 1.30 MW aggregated CMU)
(Estimated)
Basingstoke Chineham Sc - Hampshire and South Downs RG24 8BQ (1 component)

Commercial sites

Active • 2024-25 (T-1)
6.78 MW (part of 6.78 MW aggregated CMU)
(Estimated)
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (25 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1.07 MW (Est from CMU) (part of 1.07 MW aggregated CMU)
(Estimated)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes DN22 8DB (6 components)

Battery storage

Inactive • 2021-22 (T-4), 2018-19 (T-1)
No capacity data
(Estimated)
No capacity data
(Estimated)
Bilsthorpe 1 Energy Park Former Colliery Bilsthorpe Newark Notts NG22 8ST (6 components)

1x 1.55MW Containerised Generating sets.

Inactive • 2016-17 (TR)
1.07 MW (Est from CMU) (part of 1.07 MW aggregated CMU)
(Estimated)
Bilsthorpe Colliery Site Bilsthorpe Newark Notts NG22 8ST (7 components)
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
(Estimated)
Bilsthorpe Colliery Site,Bilsthorpe, Newark, Notts, NG22 8ST (5 components)

MWM TCG 2020 x 2 1 x CAT 3520

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
Bletchley Beacon Rp - Northants and Bucks MK1 1BN (1 component)

Commercial sites

Active • 2024-25 (T-1)
3.25 MW (part of 3.25 MW aggregated CMU)
(Estimated)
Boston Landfill Site, Slippery Gowt Lane, Wyberton, Boston, Lincolnshire, PE21 7AA (5 components)

Solar PV generation site

Active • 2027-28 (T-4), 2025-26 (T-4) ...
2.08 MW (Est from CMU) (part of 2.08 MW aggregated CMU)
(Estimated)
Bristol Avon Meads Rp - Bristol BS2 0SP (1 component)

Commercial sites

Active • 2024-25 (T-1)
0.92 MW (part of 0.92 MW aggregated CMU)
(Estimated)
Bristol Emerson Green - Bristol BS16 7AE (1 component)

Commercial sites

Active • 2024-25 (T-1)
1.18 MW (part of 1.18 MW aggregated CMU)
(Estimated)
3.51 MW
(Estimated)
Chichester North St - Portsmouth and Worthing PO19 1LB (1 component)

Commercial sites

Active • 2024-25 (T-1)
21.03 MW (part of 21.03 MW aggregated CMU)
(Estimated)
Cocknage Road, Stoke on Trent, Staffordshire, ST3 4AW (5 components)

1 x MWM TCG 2020

Inactive • 2017-18 (T-1)
No capacity data
(Estimated)
1.75 MW (part of 1.75 MW aggregated CMU)
(Estimated)
4.49 MW (Est from CMU)
(Estimated)
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.64 MW (Est from CMU) (part of 7.64 MW aggregated CMU)
(Estimated)
Loading map...