Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

1648 unique locations (13660 components) - Page 1 of 66

Sort by: A-Z Components MW Date
100 Cathcart Rd, Glasgow G42 7BH (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (44 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.59 MW
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (13 components)

Enfield CCGT Power Station - (one unit station) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1217.86 MW
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
4.19 MW
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (8 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
17 Oak Tree Road, Fen Drayton, Cambridge, CB24 4SS (3 components)

2 x gas fired CHP generators located at a horticultural site. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
5.46 MW
1 Barnett Wood Lane, Surrey, KT21 2BU (1 component)

98 MW BESS

Active • 2028-29 (T-4)
15.46 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine (2)
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1961.87 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 To 17 Inclusive, Titan Drive, Peterborough, PE1 5XN (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
288 And 290 Hillgrounds Road Kempston Bedford MK42 8SZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
2 Bar Lane, York, YO51 9LS (90 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2 Samworth Way, Melton Mowbray LE13 1GA (5 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.00 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
322 Broomloan Rd, Glasgow G51 2JQ (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (1 component)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
12.86 MW
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
0.69 MW
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 component)

New build battery storage

Active • 2028-29 (T-4)
8.90 MW
4.57 MW
96 Kings Rd, Immingham DN40 1QS (1 component)

New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.

Active • 2028-29 (T-4)
3.23 MW
Loading map...
Showing 25 locations