Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

All Locations

3641 unique locations (14038 components) - Page 1 of 146

Sort by: A-Z Components MW Date
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
44.72 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (13 components)

Enfield CCGT Power Station - (one unit station) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1217.86 MW
160 Corporation Road, Newport, Gwent, NP19 0WF (8 components)
• 0.39MW Battery Storage located at Newport Bus depot (2)
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
• CMU FES26B which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (4 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.70 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine (2)
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1961.87 MW
2 Bar Lane, York, YO51 9LS (90 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2 Engineers Way, Wembley, Middlesex, HA9 0JS (6 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.39 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components)
• Operational gas reciprocating engine. (2)
• Operational Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (9 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (10 components)

District heating implementation of two gas CHP engines with no auxilliary load (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.48 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
37 Wenlock Way, Leicester LE4 9HU (3 components)

bus depot (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.91 MW
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (8 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.60 MW
44-48 E Dock St, Dundee DD1 3JS (5 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.54 MW
4 Chemistry Ln, Pentre, Deeside CH5 2DA, UK (4 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
26.16 MW
4 Finway Road Hemel Hempstead HP2 7PT (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.48 MW
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (6 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
3.53 MW
ABBEYDALE PARK RISE, SHEFFIELD, S17 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
ABBEY HILL ROAD, WINCHESTER, HAMPSHIRE, SO23 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Loading map...
Showing 25 locations