Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

4256 unique locations (26599 components) - Page 1 of 171

Sort by: A-Z Components MW Date
100 Cathcart Rd, Glasgow G42 7BH (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
133 Balornock Road, Glasgow, G21 3UW (10 components)

Generators on hospital site (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
1345 Govan Rd., Glasgow, G51 4TF (4 components)

CHPs at Queen Elizabeth Hospital (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.16 MW
160 Corporation Road, Newport, Gwent, NP19 0WF (11 components)
• 0.39MW Battery Storage located at Newport Bus depot (2)
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Thane Road West, Nottingham, NG2 3AA (60 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 component)

1x diesel generator with a total rated gross power capacity of 2.900 MW

Active • 2024-25 (T-1)
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.83 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.13 MW
2 Samworth Way, Melton Mowbray LE13 1GA (6 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.33 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (11 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
3 Kelvin Way, West Bromwich B70 7LH United Kingdom (2 components)

Industrial sites (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (9 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
• gas generator
Active • 2026-27 (T-4), 2025-26 (T-1) ...
15.80 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (12 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load (2)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.25 MW
530 London Road, Croydon, CR7 7YE (4 components)

Gas fired CHP unit (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
1.41 MW
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (8 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
66 Molesworth Street, London SE13 7EY (8 components)

Gas fired CHP unit (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.08 MW
AB10 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
AB12 (7 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.05 MW
AB15 (8 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.05 MW
AB21 (2 components)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
Loading map...
Showing 25 locations