Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

1100 unique locations (5933 components) - Page 1 of 44

Sort by: A-Z Components MW Date
1020 CENTRE PARK, WARRINGTON WA1 1QY (3 components)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
112 Beddington Lane, Beddington CR0 4TB (6 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
13 - 18 Queen Street, Oxford, OX1 1AB (1 component)

DSR Component providing load turn down at a retail store

Inactive • 2021-22 (T-4)
1345 Govan Rd., Glasgow, G51 4TF (6 components)

CHPs at Queen Elizabeth Hospital

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.16 MW
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (5 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (10 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
195 Aylesone Rd, Leicester LE2 7QJ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1A Yardley Road Liverpool L33 7SS (1 component)

Energy storage system providing capacity market, dynamic FFR and other balancing services.

Inactive • 2021-22 (T-4)
1 Kirkhaw Lane Knottingley WF11 8RD (1 component)

20 MW Storage facility located at Knottingley.

Inactive • 2021-22 (T-4)
1 Loicher Ln, Sheffield S35 9XN, UK (1 component)

2MW 60 minute frequency response battery storage

Inactive • 2021-22 (T-4)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (8 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (19 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW
2236 London Road, Glasgow, G32 8YF (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
24A Flightway Dunkeswell Honiton EX14 4LG (3 components)

New Build Generating CMU comprising of a battery storage asset

Inactive • 2021-22 (T-4), 2018-19 (T-1)
25 Southfield Lingard Lane Stockport SK6 2QN (16 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4), 2021-22 (T-4)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (6 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Gas reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
2 Leeds City Office Park, Leeds, LS11 5BD (6 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations