Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

All Locations

328 unique locations (1869 components) - Page 1 of 14

Sort by: A-Z Components MW Date
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
No capacity data
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (2 components)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
No capacity data
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
No capacity data
530 London Road, Croydon CR7 7YE (7 components)

CHP

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (9 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
No capacity data
Addenbrookes Hosp (Pasa Purchase), Hills Road, Cambridge, CB2 0SB (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
No capacity data
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (11 components)

Crystal glass recycling facility.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
No capacity data
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (5 components)

The system comprises of two gas reciprocating engines provided an exported output of around 2MW.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (9 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
No capacity data
Aylesford BES Site, Old Church Road, Burham, Kent, ME20 7TN (3 components)

29 MW of DSR

Inactive • 2020-21 (T-4), 2020-21 (T-1)
No capacity data
BARNHAM CROSS WS, BARNHAM CROSS WS, Barnham Common, Track Off Bury Road, THETFORD Norfolk, IP24 3PP (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Barrow Heath WS, BARROW HEATH-WS, The Heath, Sapiston, BURY ST. EDMUNDS Suffolk, IP29 5DB (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Barrow WTW, BARROW WW, Track off Caister Road, op Vale Lodge, BARROW-UPON-HUMBER South Humberside, DN19 7DY, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Barton Fleetgate TPS, BARTON-FLEETGATE TPS, Waterside Road, East Halton, BARTON-UPON-HUMBER, DN18 5BD, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (6 components)

Battery Energy Storage System

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
No capacity data
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
Bedford STW, BEDFORD STW, Cardington, BEDFORD, MK44 3SD (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
No capacity data
1.07 MW
Loading map...
Showing 25 locations