All Locations
550 unique locations (2024 components) - Page 1 of 22
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (4 components)
1 Midland Road, London, NW1 1AT (1 component)
One GE Genbacher 612GS 2MWe CHP
1 Midland Road, London, NW1 IAT (1 component)
One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator
2 Leeds City Office Park, Leeds, LS11 5BD (4 components)
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (2 components)
3 MW of demand reduction (2)
43 Devon Street, London, SE15 1AL (6 components)
4 Chemistry Lane, Pentre, Deeside, CH5 2DW (2 components)
14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network. (2)
530 London Road Thornton Heath London CR7 7YE (4 components)
Hospital (3)
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (2 components)
Offsite with behind the meter generation (2)
9 J3 Business park, Balby Carr Bank, Doncaster, DN4 8DE (5 components)
A new build gas fuelled generating station. (3)
A66 and Tees Dock Road, Grangetown TS6 7HJ (1 component)
New build power station comprised of multiple reciprocating engines.
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)
4 MW of demand reduction (2)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (2 components)
0.27MW of demand reduction (2)
Albion Close, Worksop, Nottinghamshire, S80 1RA (2 components)
New reciprocating genset in acoustic enclosure (2)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)
battery storage (3)
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)
Battery Energy Storage System (2)
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)
A new power plant, with associated civil works, switchgear and electrical connection. (3)
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6ZA (3 components)
The system comprises of two gas reciprocating engines provided an exported output of around 2MW. (2)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (3 components)
On-site existing CHP generating unit (3)
ASDA Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (1 component)
Disabling load of refrigeration plant through remote switch.
ASDA Ayr, Liberator Drive , Ayr, KA8 9BF (1 component)
Disabling load of refrigeration plant through remote switch.